Draw requests fail on documentation, not on math. Relay 1.9 keeps the evidence attached to the quantity from the moment a foreman records it, so assembling the package is a review step rather than a scavenger hunt.
What shipped
- One-pass assembly. Approved field quantities, their photos, and the crew sign-off travel together into the draw package. No re-keying, no chasing a phone camera roll on the last day of the month.
- Lender-shaped output. The package exports in the format your lender's route already expects, so it moves through Interchange without a manual repack.
- Blocking issues up front. Missing lien waivers, unsigned inspections, and quantities that exceed the schedule of values are flagged before submission instead of coming back as a rejection two weeks later.
Notes
Existing draws in flight are untouched. The new assembly applies to any draw opened after the upgrade, and the old manual builder stays available from the draw menu through the end of the year.